Conrad-Blenkle-Straße 36, Berlin – Construction cranes erected and shell construction work is starting
The construction cranes have been erected and the erection of the shell is already in full swing, which means we are on schedule. The perimeter insulation for the ceiling under the second basement level is being laid and the floor … Continued