Construction progress Messestrasse II 22.08.2017
The cranes are turning like a prater ride business!
Almost all the walls are on the ground floor and the ceiling above is partly concreted. Formwork for the walls on the first floor was started.
The dismantling of the excavation protection has not yet been completed, the sheet piling towards Prater has yet to be drawn.