• EN
  • DE
array(6) { ["path"]=> string(19) "/var/www/html/media" ["url"]=> string(26) "https://www.wg-a.com/media" ["subdir"]=> string(0) "" ["basedir"]=> string(19) "/var/www/html/media" ["baseurl"]=> string(26) "https://www.wg-a.com/media" ["error"]=> bool(false) }
  • Home
  • News
  • About Us
    • Company
    • Team
    • Organization chart
    • Services
    • Integrated management system
    • Partners
    • Memberships
    • Media
    • Annual report
    • Code of Conduct
    • Imagevideo
    • Imprint
  • Projects
  • Sustainability
    • Sustainability
    • BIM
    • Building in Existing Contexts
    • Timber Construction
    • Modular Building
    • ESG | EU Taxonomy
    • Certification
  • Careers
  • Contact

Construction Progress

Educational Campus Aron Menczer, Vienna – There is still a lot more to accomplish before the end of the year

14.12.2020

The year 2020 is coming to its end and the completion date is gradually approaching at the BC Aron Menczer construction site. The installation of the glassed-in areas is almost finished. Parts of the building have also been equipped with … Continued

Rugierstrasse, Vienna – Before the well-deserved Christmas break, work is going at full speed

10.12.2020

In both building sections, the fillings, impact sound insulation and underfloor heating pipes have been installed continuously and quickly. According to the planned construction schedule, the work was timed in such a way that the screeds were laid first in … Continued

Educational Campus Seestadt Aspern North, Vienna – The interior work is already in an advanced stage

10.12.2020

The interior works at the Liselotte Hansen – Schmidt Education Campus are progressing well. Currently, the floor screed work and the installation of the suspended ceilings are being carried out in some parts of the building. The suspended ceiling in … Continued

Rugierstrasse, Vienna – The work is on schedule and is progressing step by step

10.11.2020

Inside of staircase 2, the drywalls were sealed after the installations was completed. Here the pouring of the fill is already in progress as a first stage of the screed work. In staircase 1, the electrical and sanitary installations are … Continued

Gailenbachweg, Salzburg – The PRISMA components have been completed

04.11.2020

The PRISMA components (components N5-N8) have been completed. A total of 77 flats including garage space have been built and are now ready for their future use. Some flats have already been occupied. Whilst the new occupants are already moving … Continued

Educational Campus Seestadt Aspern North, Vienna – The installation work is in progress

30.10.2020

The interior work on the education campus is progressing rapidly and there has also been noticeable progress on the exterior. Most of the substructure for the suspended ceiling in the exterior area of component A has already been installed and … Continued

Wagramer Strasse 115-117, Vienna – The project is now on the finishing straight

14.10.2020

The residential complex at Wagramer Straße 115-117 is on the last home stretch.The painted balcony balustrades and the abrasion of the plaster façade already show the external appearance. The construction work is also progressing rapidly on the interior. All floor … Continued

Educational Campus Aron Menczer, Vienna – A lot is happening on the construction site

13.10.2020

Outside and inside the educational campus, the construction is continuing! Meanwhile, all prefabricated parts made of white cement have been moved and the concreting of the ramp structure has also been completed.The construction work on the facade is also making … Continued

Rugierstrasse 55, Vienna – The extension work is progressing well

09.10.2020

The extension work is progressing at a rapid pace. All of the trades are working on the various elements of the building simultaneously. The drywallers have prepared most of the walls in both buildings so that the plumbers and electricians … Continued

Stadlauer Strasse 64, Vienna – The finishing touches are being made

08.10.2020

The 407 flats in the Stadlau residential park are pretty much finished! The parquet and the porcelain tiles have been laid. The painter only has a few more jobs to complete in individual flats. At the same time, the façade … Continued

  • ← Older posts
  • Newer posts →

Archiv

  • June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September June
  • Categories

    • BIM
    • Construction Progress
    • Construction Start
    • End of construction
    • Others
    • Our company location
    • Site Visit
    • Sustainability
    • Uncategorized
    • WGA team
    WGA ZT GmbH
    Bloch-Bauer-Promenade 21
    1100 Vienna
    +43 1 320 3551-0
    office@wg-a.com
    WGA Deutschland GmbH
    Wilhelmine-Gemberg-Weg 6, entrance D
    10179 Berlin
    +49 30 240 08 97-0
    deutschland@wg-a.com
    WGA Deutschland GmbH
    Hanauer Landstraße 136A/101
    60314 Frankfurt on the Main
    +49 69 580 02 69-0
    deutschland@wg-a.com
    Imprint
    © 2025 WGA ZT GmbH