Winter seems to be almost over because the building structure has already emerged from the construction pit in the friendly weather. The formwork work on the walls in the basement is almost complete and therefore the remaining walls of the basement can be concreted soon. As you can easily see, not a single inch of the construction site remains unused and in between there is a lot of work going on in several places at the same time.