Even the brief outbreak of winter could not stop the progress of the structural work. The foundation slab’s reinforcing work was mostly completed, and it can still be concreted before the Christmas break. The pipes of the deep wells are clearly visible, and they will be connected approximately in the middle of the floor slab and will later provide the heating and the cooling system for the project with the help of the heating pump technology.