In Christian-Bucher-Gasse, work is proceeding at full speed on the outside and inside of each corner of the two building sections. The outer shell has already been sealed. The windows have also been installed in the meantime. Inside, the finished rooms can already be guessed at. On the lower floors, the screeds have been laid and the drywalls closed. Electrical and installation work is now starting.