Construction progress Anschützgasse

Construction progress Anschützgasse 12.12.2017

Building work in the Anschützgasse is moving forward quickly. As you can see from the photos, the façade is just being finalized. Only the enamel glazing is missing from the dormers. The lower construction of the protruding façade construction has already been installed. Work to install drainage channels is also in full swing.
Inside, tiling work has just started on the staircases. Even the railings have already been installed. The suspended ceilings in the corridors are already in place as well. The lights have been installed in the offices.
The flats are also slowly taking shape. The first residents can move into these in spring 2018.

 