Construction progress Anschützgasse 02.10.2017
The construction work at Anschützgasse is progressing rapidly. All drywall walls were placed in the office floors. The wet cells are already tiled. The lift has also been installed and the electrical and building services are fully underway. In the two upper floors, the apartments also slowly take shape. The stairway substructures were installed and the drywalls were erected. The thermal insulation is installed parallel to the facade and the first elements of the facade structure are mounted.