Construction progress Anschützgasse 20.02.2018
The construction work in Anschützgasse is progressing rapidly. The upper end of the superior steel structure has already been covered with sheet metal and the sheet metal partitions were installed as well. Half of the façade was also slatted. The different distances between the slats create already a unique façade appearance. The existing plant troughs around the current building were demolished. As an alternative design, bevelled concrete elements will soon take their final place.