Construction Progress Eckertstrasse 27.07.2017
The shell is finished. Portals and windows are already in place. At present, the complete thermal protection facades are produced. On the north side you can already see a finished section.
At the same time, the interior in the apartments is under construction. While the nursery school is already fully operational, floors and tiles are laid in the floors above and on the upper floors screeds are cast and railings are installed.