Construction progress Eckertstrasse 23.11.2017

The façades for the residential floors are mostly complete. The areas of the building site still being used for storage or where work is continuing are gradually getting smaller and smaller, scaffolding and construction equipment are all disappearing, which means that you can already see the final results of what large sections of the buildings will look like.
The open spaces for the kindergarten are already being used intensively. All of the other outdoor facilities are still works in progress. The interior design work for the flats is reaching its final stages. The floor tiles are being laid in the staircases and the walls are being painted. Handovers are due to start early in 2018!

 