Educational Campus Seestadt Aspern North, Vienna – The installation work is in progress

The interior work on the education campus is progressing rapidly and there has also been noticeable progress on the exterior.
Most of the substructure for the suspended ceiling in the exterior area of component A has already been installed and the installation of the substructure for the Alucobond façade has also begun. The railings are gradually being installed on the terraces and in the air spaces some of the steel trusses for the greenery on the façade are already in place. Work on the interior fitting for the youth centre has started and the project is progressing well.

 

<<see project>>