The construction work inside the building continues in parts 1 and 2. The floors in the apartments will shortly be finished, the perlite leveling and insulation fill has been applied in every room and the dry screed panels with underfloor heating are currently being laid. The construction work on the 3rd building unit is now well ahead. The structural work has been completed and the roof was waterproofed. In the outdoor areas, the base layer for the road and pavement surfaces were prepared.