The construction of the building structure for all eight new building units is now ready! At this point, the last windows and the post-and-beam facades will be installed for the building units N1-N8. The railings, as well as the room-high lock constructions of the balconies and loggias, will be assembled one by one. The interior work, which has already started on all the building units, is at different stages. The building unit N7 is the most progressive, which can now be considered the first one to be built without any scaffolding.