Thanks to the beautiful autumn weather, construction work on the old length of the mill in Salzburg is progressing rapidly, so that a second crane has already been placed on the construction site. The concreting of the first foundation slabs started in late October and the first walls will be formed soon. At the same time, the digging work is in full swing. The structural work for the spacious garage is scheduled to be completed in Spring of 2019.