Construction progress Hofwiese, Mitterndorf a. d. Fischa 04.11.2019
After a quick installation of the exterior of the building, the facade was installed on both construction elements. Inside the building, work is in progress on the interior. After finishing the partition walls, the dry walls were set up and the sanitary equipment installed in the apartments. At the same time, the work on the exterior facilities is progressing well. The foundations for the outbuildings and parking lots were concreted in the middle of the exterior facilities and all pathways and parking lots will soon be asphalted. The residential building is expected to be finished until the end of November.