Even though the weather conditions are sometimes quite difficult, the building structure still gets done. The walls of the ground floor are already completed in their entire length. At the Hofwiesengasse some walls on the 1st floor were already concreted. This is also the case for the building component 1 on Lainzer Strasse. At present, in the area between, the ceiling above the ground floor is being formed and reinforced.