All of structural work has now been completed. The construction work on the roof of structural element 1 has already been completed. The drywall construction has already been completed in structural elements 1 and 2 and the backfill has been put in. These two sections have now also been scaffolded and the composite thermal insulation system is currently being installed. In structural element 3 the roof is going up and the last few windows are being put in. The interior work is also progressing well. The drywalls are being built and the electrical and HVAC systems are being installed.