Construction progress Messestrasse II 25.09.2017
The shell is growing! Both cranes are working diligently.
The ground floor is already concreted together with the ceiling. There are already walls on the third floor. The formwork of the ceiling above is in progress. The inlay work is progressing, e.g. the hoses of the component activation are being installed.