Construction progress Miriam-Makeba-Gasse 21.05.2019
The structural work of the building was finished on time and the interior work is progressing rapidly! The plasterboard walls were placed on the first two upper floors and the apartments’ floor plans with their bright, sunny living rooms become recognisable. The access road to the underground car park was built in the outdoor area and the infiltration system was installed. In the meantime, the first windows were manufactured in the factory and can also be delivered to the construction site and installed thereafter.