Construction progress Paulusgasse 06.11.2018
Work on the construction site is very busy. The cellar walls have been completed and the installation of the ceiling reinforcement above the cellar is in full swing.
In the back area of the property, the shuttering panels for the children’s and youth playroom are already set up.
As soon as the ground floor has been built, the upper floors will rise at a rapid pace due to prefabricated elements!