Work is progressing well in Rugierstrasse. The curing process for the screeds with underfloor heating has been completed. At the same time, the remaining drywall cladding has been closed and the screeds have been laid in the corridors. Meanwhile, the electrical and sanitary installations have been continuing in all areas. Here, the next step will be to begin with the production of the carefully selected wall and floor coverings. In the outdoor area, the preparatory work for the installation of the green roof superstructure in the inner courtyard is underway. Above this, the remaining railing elements are being installed and sheeting completed so that the superstructures can also be installed on the balconies.