The construction on the last steel-concrete floor is progressing well. The parapet walls and the elevator shaft will be moved on top of it, which will complete the framework construction in the upcoming week. At the same time, the roof of the staircase 2 was sealed and the interior work started. So painters, drywallers, plumbers and electricians are already actively engaged in equipping the apartments. The first windows were already delivered and are now being installed in each of the individual floors.