In the complete building, the screed was already placed and also heated out. The apartments on the first floor of staircase 1 are now equipped with controlled ventilation from the ground-floor to the upper floor. Afterwards, the installation of the lowered ceilings and the painting work will be completed step by step. The external design of the building is now becoming more and more visible. The facades have been plastered and the remaining sole benches and external blinds have been installed. At the same time, the installation of the balcony railings in the inner courtyard started.