Saltenstrasse 1, Vienna – Construction progress

After the digging, the brine pipes were laid and the related collecting shaft was already connected and concreted. After that, the soil was compacted again and in the deeper areas, for the double park facilities, the surface layer and the waterproofing system had already been installed, so that the installation of the armouring could begin. The next stage is to concrete the various sections in the construction pit.

 

<<see project>>