The excavation pit protection has been completed and the water drainage system installed. While the clean layer on the second basement floor has already been laid, the excavation work on the first basement floor continues. The first crane was installed and the foundation reinforcement was installed on the second basement level. The first sections are currently being concreted so that the walls can be set up as quickly as possible.