Thanks to the magnificent weather, the construction work is progressing rapidly. The 1st basement is almost finished and parts of the ground floor are already visible. Because of the work of three cranes and about 70 construction workers it is possible to work parallel on all staircases. The drainage system has already been switched off and the sheet piles were removed. The ground floor area can now be quickly built due to the dissolved load-bearing structure. Beginning on the 1st floor, the construction dimensions of the individual staircases begin to be visible.