Viktringer Ring 28, Klagenfurt – Construction progress

The expansion of the facade is progressing continuously upwards. In the meantime, all window elements are firmly fixed in the building structure and work has started already with the preparations for the high-quality Alucobond facade serving as the final surface. At the same time, the composite thermal insulation facade was installed in the inner courtyard. At the same time, the entire roof covering is being sealed.
Also inside the building people are working very hard. Dry construction walls were placed, the double floor in the offices was layed, the installation of the hanging ceilings has started and amongst that, the house and electrical engineers are busy with laying their electrical lines. This means that the Brain@Work project can be handed over to the client on the scheduled deadline.