Construction progress Weinzingergasse 28.06.2019
The different construction groups are working on the expansion of the house. Whereas inside the walls and installations are completed successively one after the other, all the wooden-aluminum windows have already been installed. For this, and for the assembly of the substructures, the necessary supporting equipment was provided. At the same time, the sealing work was also carried out on the roof and the construction on the tilted roof was finished. In the following, the remaining interior walls will be completed, then they will be sealed and the preparatory work for the facade will be carried out.