Construction progress Weinzingergasse 26.09.2019

Three sides of the building already shine in bright white of the finished plaster coating. The insulation that makes up the EWIS has already been applied to the street façade along with the various structural elements. At the same time, the cover panels are mounted on the roof and the handrails are built in accordance with the natural dimensions. Meanwhile, the interior space of the building is in the process of being prepared for the surfacing installation. The wall surfaces were primed, sanded and leveled before they were painted.

 