Construction progress Weinzingergasse

Construction progress Weinzingergasse 24.11.2018

The digging work is progressing very well, so that the crane foundation could be started in the rear area.
In the meantime, the connecting pipes for the in-depth drilling and the ditch for the double parking facility were also installed here.
Due to the careful preparation and savety, all this work could be carried out quickly.
As a result, the construction ditch will now be prepared for the building of the floor panel.

 