Construction progress Weinzingergasse 22.03.2019
The entire team is happy after having completed the exhausting cellar work. Now the above-ground floors of the structural building are being lifted up one after the other. In the meantime we reached the walls on the 2nd floor. Also the mobility within the building is much better at the present time, as the first stair runs are now offset. At the same time, the electrician’s inlay work continues and the first cabling has already been connected.