Construction progress Wenhartgasse 18.12.2017

The floor structure including under-floor heating will also be laid once the drywalls have been completed. External work is also progressing; the roof structure is almost finished.
Work on the street-side thermal insulation system was interrupted so that the pavement could be laid. The ceiling insulation has been installed in the garage, the evaporation channels are currently being manufactured and the metal barriers are being fitted, the asphalt surface is due to be laid in the next few days.

 