Construction start Weinzingergasse
In the very city center of Döbling, work has started successfully on a residential building with seven apartments. As a construction preparation, the uppermost area of the ground was already removed during the advance construction and the site equipment was set up. Prepared in this way, the delivery of the heavy drill rig for the drilling pile work could be carried out with no difficulty. The axes are also already plugged out so that the drilling work can begin immediately.