Things are getting busy on the property on Dröpkeweg. In the residential units, substructures are currently being erected for the installation of the system interior walls from Lukas Lang Building Technologies GmbH, which will follow immediately afterwards. As soon as the tiling work in the sanitary rooms has been completed, the plumbers will subsequently start installing the sanitary items. The suspended ceilings in the corridor areas have also been installed. The house connection room and the electrical room have been equipped. The scaffolding has been almost entirely dismantled. Next, the facade formwork will be hung on the first floor.