In the last few weeks, quite a lot has happened on the construction site. The construction pit was refilled after the pipes were installed. The ground floor slab, as well as the staircase core of steel-reinforced concrete, were cemented after the necessary reinforcements were put in place. The plinths were installed and fitted with the system façade elements including the French doors. As for the supporting structure, the system columns, the system girders, and the required KLH walls were set up and inserted floor by floor.