We are pleased to report on the current progress of the building site. The screed has already been concreted up to the 4th upper floor in both building sections. The dry walls in building section 1 have been closed on one side with planking up to the 7th upper floor. At the moment, the wind light bonding of the windows is being completed. The profiles for the mullion-transom construction have also been installed. We are on the right track and look forward to further progress.