The work on the Ellener Hof building is going into the next round. The foundation slabs for both buildings have now been successfully completed. Therefore, the work on the system structure could be started. The entire ground floor structure of one of the two buildings is already in place. The concrete staircase has also been erected up to the first floor. The second component is being built one storey later.