The locksmith made the security rails for both houses out of flat steel.
The banisters for the staircases were later painted in anthracite. The railings of the roof terraces will also be installed on the parapet system elements from Lukas Lang Building Technologies GmbH.
As part of the interior finishing work, the external wall cladding was installed, as well as the fillings and impact sound insulation panels, in preparation for the screed work.