The substructures of the wooden privacy screens between the private areas and the public roof terrace are being installed on the rooftop terrace. The rope safety systems have been installed on the roofs of the two houses, which will be green roofs, and the waterproofing work has been completed.
The interior work in the houses is progressing steadily. The substructures of the conventional drywall are being installed.