The construction site in Gaadner Straße in Hinterbrühl is working efficiently to ensure the success of the residential project with a total of eleven flats.
As the temperatures continue to drop outside, the house insulation layer is being added. Now that all the windows have been installed, the interior work is in progress.
All the installations and drywall work have already been completed, so it is now the turn of the floor structures.
The heating pipes for the future underfloor heating are now being installed on top of the underfloor sound insulation.
This will ensure that the flats will always stay comfortably warm during the upcoming winters.