In the coming months, a high-quality residential building with eleven residential units will be built in a quiet location in the center of Vienna’s Donaustadt district. The free-standing building is primarily defined by its clear structure and its generous open spaces. After the previous building was demolished in the month of August, the foundation pit was quickly dug. Subsequently, the sub-base layer was installed and the preparatory work for the construction of the structural framework was finished. In the meantime, the floor panel for the partial basement was concreted, and furthermore, the crane for the remaining work was set up. In the next few days, the prefabricated basement walls will be delivered to the construction site and then installed.