The structural work started in the middle of November 2023 after the concrete for the strip foundations and the floor slab had already gone in. The welding track will be laid over the next few weeks before Christmas and the pipework that will connect the existing building with the new block will be installed. The ongoing construction planning meetings to coordinate the building services and electrical systems will take place at the same time and the construction sign will also go up soon.