The edge brackets that will be used to suspend the metal long-span ceilings are being mounted along the walls and ceiling aprons of components B and C. The substructures for fixing the band raster cooling ceilings are also already visible on the ceiling soffits of the future rental areas. The elements of the raised floor that run towards the outer walls of the concave and convex surfaces of the rotunda are currently being cut to size and laid individually. Outside, the steel sections for the canopy lifts will soon be completed. This means so that in future refuse can be collected from the underground car park.