The expansion work is progressing rapidly in the model zone. The metal stud walls of all sanitary rooms have already been planked on one side. The mounting frames for and the installations of the sanitary items are also built into the walls. After the electrical lines have been laid, the walls can be closed. A lot is also happening on the flat roofs of the building components B and C. The old structure and the existing parapet sheet metal is being removed.