End of construction Anschützgasse 30.05.2018 In cooperation with STRABAG AG as general contractor, the office building with living space was successfully completed for LSE Liegenschaftsstrukturentwicklungs GmbH. The four office floors and the two uppermost residential floors with a total of … Continued

Construction progress Anschützgasse

Baufortschritt Anschützgasse

Construction progress Anschützgasse 12.04.2018 The construction work in Anschützgasse is entering its final phase and completion is approaching. The final completion work is currently being carried out in the interiors and the existing facade on Anschützgasse will soon be repainted. … Continued

Construction progress Anschützgasse

Baufortschritt Anschützgasse

Construction progress Anschützgasse 05.03.2018 Despite the icy temperatures, the construction work in Anschützgasse is progressing rapidly. With the installation of the last lamellas, the façade work is entering its final phase, the office floors have already been totally completed and individual … Continued

Anschützgasse 1, Vienna

Project information

Procedure
Selection procedure
Client
LSE Liegenschaftsstrukturentwicklungs GmbH
Messeplatz 1
1021 Vienna
Principal
STRABAG AG
Donau-City-Strasse 9
1220 Vienna
Address
Anschützgasse 1, 1150 Vienna
Start of planning
06/2016
Start of construction works
11/2016
Completion
05/2018
Construction costs
18,20 Mio. (net)
Size of order
General planning
Final design and approval planning : Arch. DI Michael Schluder

Nearby the Schönbrunn Palace and along the Linke Wienzeile the property is located in the 15th district of Vienna. The existing warehouses along Linke Wienzeile should be demolished. On the other hand the office-building along Anschützgasse is planned to be maintained and partially restored. On the site of the demolition building, a new seven-storey office and a residential building arise. In the top floors ten residential units are planned.
The concept is based on a hybrid-construction of a mineral structure of concrete and a wooden structure for the upper floors. The façade with fully upgraded insulation is sun and weather protected by wooden slats.
In the intersection between new and existing buildings there is placed the main access. The ground floor offers generous service and waiting areas. This space is a connecting element at the edge between old and new buildings. A clearly room concept extends over the entire office floors. The residential units in the last two top floors are oriented to Linke Wienzeile and dominates with its big two-storey dormers.