Office building Salzer, St. Pölten

Project information

Procedure
Selection procedure
Client
TOSACO GmbH
Stattersdorfer Hauptstraße 53
3100 St. Pölten
Principal
Lukas Lang Building Technologies GmbH
Firmiangasse 7
1130 Vienna
Address
Stattersdorfer Hauptstraße 53,
3100 St. Pölten
Start of planning
05/2018
Start of construction works
06/2018
Completion
10/2018
Construction costs
-
Size of order
Execution planning,
The preliminary design up to the approval planning: Moser Architects ZT GmbH

An office building including an outbuilding and a car park was constructed at Stattersdorfer Hauptstraße 53 in St. Pölten. The office building was constructed using a timber frame construction method (Lukas Lang modular system) with solid columns and spruce girder and ceiling elements. An outbuilding and a car park for 25 cars, 5 bicycles and a lorry were also built in the immediate vicinity.

The building was divided into three floors above ground and is divided into a reception/waiting area, office space, recreation rooms, storage rooms, work rooms, meeting rooms, sanitary facilities, archive and storage areas, technical and IT rooms and kitchenettes, all of which are accessible via a staircase with a lift. The entrance to the building is located on the access road that leads directly to Stattersdorfer Hauptstraße.

The building is accessed via the north-east side via an entrance portal, which is designed as a two-storey timber-aluminium mullion and transom construction with a curtain wall façade, including a solid timber vestibule.

Like the office building, the outbuilding, which contains essential parts of the technical building equipment, is a timber construction with a flat roof. This building is accessed via a narrow entrance that leads past the side of the main building.