End of construction Cityquartier, Wiener Neustadt

End of construction Cityquartier, Wiener Neustadt 20.12.2019 Just in time for the holidays, the last work on the remaining outdoor facilities and tree plantations on the entire compound was accomplished. Thus the project “Cityquartier Wiener Neustadt” was completely finished for all … Continued

Construction progress Cityquartier, Wiener Neustadt

Cityquartier, Wiener Neustadt

Construction progress Cityquartier, Wiener Neustadt 08.07.2019 The work on the construction site 1 is finished and the entire building unit was handed over to the client. In cooperation with STRABAG AG as the general contractor, 89 apartments and an underground … Continued

Construction progress Cityquartier, Wiener Neustadt

Baufortschritt Cityquartier, Wiener Neustadt

Construction progress Cityquartier, Wiener Neustadt 21.05.2019 The completion date of lot 1 is getting closer and closer. The final work on the outdoor and indoor areas is currently in progress of being completed. The work is also progressing rapidly on site 3 … Continued

Cityquartier, Wiener Neustadt

Project information

Procedure
Selection procedure
Client
Haring Group Bauträger GmbH,
Doningasse 12,
1220 Vienna
Principal
STRABAG AG Direktion AS Hochbau
Bereich Niederösterreich Süd, Burgenland
Schleppbahngasse 8
2700 Wiener Neustadt
Address
Gymelsdorfer Gasse 48A , 2700 Wr. Neustadt
Start of planning
01/2013
Start of construction works
02/2017
Completion
09/2019
Construction costs
22,95 Mio. (netto)
Size of order
Architecture planning

On the former public bath area Wiener Neustadt two L- shaped buildings define the street edge Gymelsdorfer Gasse. Three detached town villas are arranged laxly in the clearance situation originating behind it and show the crossing to the adjoining bases. Under the building ensemble a coherent underground parking is arranged.

All together 291 residential units with a flat mix of 2-4 rooms are established. The open spaces are composed of a parking bay, two playgrounds, one of it a small children’s playground in the direct area of the residential arrangement and an other youth playground in the northern area of the property.

The ground floor zone forms formatively a base zone, about this 1.-3. upper floor raises as a formative unit. A running around clear parapet completes both l-shaped construction bodies by height of the 3rd upper floor. About that the put back attic develops. On account of the dedication of an allowed building height from max. 11,0m and for this reason max. 4 allowed main floors, the uppermost floor is trained as an attic with an eaves-sided knee floor height from the floor of at most 1.20 meters.

Architecturally three town villas are formed after the same principle like both l-shaped construction bodies and prove a harmonious, formative general view of the residential arrangement.