News

University of Augsburg – Construction completion

We are pleased to announce the successful completion of our project at the main campus of the University of Augsburg. A modern laboratory building with an office section was built on a previously rarely frequented car park using sustainable modular … Continued

University of Augsburg – Topping-out ceremony

The topping-out ceremony for the University of Augsburg construction project took place in bright sunshine on 29.04.2024. The shell for the new three-storey research building and the two-storey laboratory building was built on the former parking lot between the physics … Continued

University of Augsburg

Project information

Procedure
Competition
Client
Augsburg State Building Authority
Holbeinstraße 10
86150 Augsburg
Principal
Augsburg State Building Authority
Holbeinstraße 10
86150 Augsburg
Address
Hertha-Sponer-Weg 8, 86159 Augsburg
Start of planning
02/2022
Start of construction works
10/2023
Completion
12/2024
Construction costs
-
Size of order
General planning and object surveillance

Webcam

Webcam image is automatically refreshed every 10 seconds

 

On the main campus of the University of Augsburg, a laboratory building with an office wing is erected in modular construction on a former little frequented parking lot. The usable floor space of the new research areas is about 1.330 m².

The new building is divided into biological-physical S2 laboratories of different sizes with a total area of 550 m² over two floors and an office complex for three chairs totalling 486 m². In addition, appropriately connected functional rooms, ancillary areas, technical areas and circulation areas and traffic areas were created. A versatile roof and vertical greening of the facades gives the building a characteristic appearance. The construction measure is part of the modular building offensive as part of the High-Tech Agenda.