News

University of Augsburg – Topping-out ceremony

The topping-out ceremony for the University of Augsburg construction project took place in bright sunshine on 29.04.2024. The shell for the new three-storey research building and the two-storey laboratory building was built on the former parking lot between the physics … Continued

University of Augsburg

Project information

Procedure
Competition
Client
Augsburg State Building Authority
Holbeinstraße 10
86150 Augsburg
Principal
Augsburg State Building Authority
Holbeinstraße 10
86150 Augsburg
Address
Universitätsstraße 2, 86159 Augsburg
Start of planning
02/2022
Start of construction works
10/2023
Completion
10/2024
Construction costs
-
Size of order
General planning and object surveillance

Webcam

Webcam image is automatically refreshed every 10 seconds

 

On the main campus of the University of Augsburg, a laboratory building with an office wing is to be erected in modular construction on a currently existing but little frequented parking lot. The usable floor space of the new research areas will be about 1,250 m².

The building is divided into four biological-physical S2 laboratories, each with 120 m², and an office complex for three chairs with a total of 430 m². In addition, there will be appropriately connected functional rooms, ancillary usable areas as well as technical areas and traffic areas. A versatile roof and vertical greening of the facades gives the building a characteristic appearance. The entire laboratory building, including the office wing, is being constructed in timber. The construction measure is part of the modular building offensive as part of the High-Tech Agenda. Construction of the new research areas will start at the beginning of next year.