Due to the use of prefabricated walls and element ceilings, there is great progress on the construction site in the centre of Gablitz every week.
The reinforced concrete walls have already been erected throughout the ground floor. The ceiling above the ground floor was constructed in construction phase 1. Currently, the formwork for the in-situ concrete walls on the first floor is being erected. In construction phase 2, the ceiling above the ground floor is also being built.